Some major timetable changes are in place on the Red Arrow side starting next Monday. For starters, the 122 will be absorbed into the 107, while the 107 will be extended from Springfield Mall to the Lawrence Park Shopping Center in Broomall. This will be the third different route designator for service between MacDade Mall (or what's left of it) and the Springfield Mall in the past 5 years. The 122 service was previously known as the 111 before the 111 was re-branded as the 110 express service between 69 St and Granite Run Mall (with an extension to Chadds Ford).
The 101/102 will revert back to it's standard scheduling as opposed to the same departure/arrival times that had been in place due to construction on the MSHL main line between Drexel Hill Jct and 69 St. The 108 will now be operated entirely out of Red Arrow as opposed to the current Red Arrow/Southern split, presumably as a cost saving measure. Will try to post more information as it becomes available...
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment