Now, Millbourne Borough (which is actually a municipality and not just an El station stop) is also considering legal action against SEPTA regarding permit fees related to the Market St El reconstruction project. Millbourne Solicitor John McBlain accused SEPTA of refusing to pay nearly $23,000 in engineering and building permit fees, according to Friday's editions of the Delaware County Daily Times. State Rep. Mario Civera (R-164 of Upper Darby) is working on behalf of the borough to advance Millbourne's position. While borough officials view the El reconstruction project through as "an asset" to Millbourne, that hasn't stopped officials from putting pressure on SEPTA. McBlain told the Daily Times that the borough "... won't issue a permit and if [SEPTA starts] work without a permit, we will send a squad car to the site." And you thought protesters in West Philadelphia were going to be the only collective pains in SEPTA's rear...
Saturday, January 18, 2003
Now, Millbourne Borough (which is actually a municipality and not just an El station stop) is also considering legal action against SEPTA regarding permit fees related to the Market St El reconstruction project. Millbourne Solicitor John McBlain accused SEPTA of refusing to pay nearly $23,000 in engineering and building permit fees, according to Friday's editions of the Delaware County Daily Times. State Rep. Mario Civera (R-164 of Upper Darby) is working on behalf of the borough to advance Millbourne's position. While borough officials view the El reconstruction project through as "an asset" to Millbourne, that hasn't stopped officials from putting pressure on SEPTA. McBlain told the Daily Times that the borough "... won't issue a permit and if [SEPTA starts] work without a permit, we will send a squad car to the site." And you thought protesters in West Philadelphia were going to be the only collective pains in SEPTA's rear...
Tuesday, January 14, 2003
Monday, January 13, 2003
Sunday, January 12, 2003
At around 11:40pm, shortly before the end of the game, two trains were at the platform at Pattison about to depart for Fern Rock - a local and an express. The local departed about a minute before the express train, making for a very slow non-stop ride between Pattison and Walnut-Locust. Memo to SEPTA: The idea of express service is to provide a faster ride between two points, not just simply to offer non-stop service. Sending a local train ahead of an express train between Pattison and Walnut-Locust defeats the purpose of an express train.
As for the Navy Yard shuttle, only New Flyers and NABIs - most likely from Southern, though the NABIs could've come from Midvale - were used as opposed to the Neoplan artics which were used during the X Games/Phils vs. Cardinals weekend for the Navy Yard shuttle. Memo to SEPTA: If you're expecting large crowds at the Navy Yard, at the very least, it would be cheaper to use 3-4 artics instead of 6 40-ft buses.
On the El, promises of 10 minute headways were obviously not kept. Both eastbound and westbound El trains were held at 15 St until 12:05am, with the westbound train held for about 10 minutes. This made connections to some of the Red Arrow buses - particularly the 104 and 109 very dicey at best. Memo to SEPTA: Extra service on the El does not mean simply running train service an extra hour without adding headways. And while you're at it, why not use the same policy that WMATA has for feeder buses at their Metrorail stations: To wit, the last trips on the 102, 104, and 109 are not to depart until the very last El train has arrived. I'm sure there were some 104 and 109 passengers who were left stranded because SEPTA is too lazy to either add an extra trip or hold the last buses 5-10 minutes.
Let's put it this way. My evening at the Iggles game was wonderful until I took SEPTA on the trip back to West Chester. It never fails. SEPTA always seems to come up short when it comes to transporting sports fans in general. SEPTA can brag about how many Flyers, Iggles, and motocross fans used the Broad Street Line, but they don't tell you that service is inconsistent and uneven at best.
Saturday, January 11, 2003
Friday, January 10, 2003
Thursday, January 09, 2003
Wednesday, January 08, 2003
Broad Street line trains - including local and express trains - are scheduled to run every 5 minutes prior to kickoff and shortly after the game. Though, having experienced SEPTA's management of Pattison after a typical regular season game, I would doubt very highly that the schedule can be met...
Monday, January 06, 2003
SEPTA will most likely add several express trains between Fern Rock and Pattison, starting at around 4:30pm; the gates to the Vet will open at 5:30pm. Making commuting even more challenging though Center City is the Rail Power Project shuttle buses, which will effectively cut off Suburban Station from the PRR side lines (Wilmington/Marcus Hook, Elwyn, Thorndale, Trenton, and Chestnut Hill West). Also, ridership on the Regional Rail lines is expected to be higher than expected (3-4 car trains are likely on the larger lines, especially the Thorndale, Lansdale, Trenton, Chestnut Hill East, and West Trenton lines, just as it was last weekend for the Mummer's Parade), particularly on the RDG side lines (Glenside, Warminster, West Trenton, Lansdale, Norristown, Chestnut Hill East, and Fox Chase), where service will terminate at Suburban.
As noted on Friday, the easy solution would be for SEPTA to suspend the Rail Power Project shuttles until next weekend, since the Center City services are most likely going to be well above capacity on Saturday. I mean, it took SEPTA many years to finally replace the catenary and support structures along the 22 St Viaduct, so one more weekend isn't going to kill anyone - at least I would hope not. In any case...
Passengers using the Regional Rail system on Saturday may want to consider buying a "TurboPass" for $8.00. It is essentially a regular DayPass, however it allows unlimited rides on the Regional Rail system as opposed to a single ride for a standard DayPass. The TurboPass is available at the 15 St Concourse, 69 St Terminal, and Olney Terminal sales offices, the Transit Museum Store at 1234 Market, and at all Railroad Stations (Center City and outlying stations).
- SOUTH JERSEY to PHILADELPHIA
- ROUTE 313 will now be rerouted through Glassboro to offer direct service to the Rowan University campus; service will begin operating to the new Vineland Transportation Center at 2 St and Landis Av, replacing the current Vineland Bus Terminal at 4 St and Landis Av starting next month.
- ROUTE 400 will see new service to the Pennco Tech campus in Blackwood, timed mainly to the class start and end times; the end of the line in Turnersville will be extended to the intersection of Sicklerville Rd and Thousand Oaks Dr; a new "holiday" schedule has been introduced, which will be issued as a separate timetable from the regular schedule, and be in effect on Martin Luther King Day (January 20), President's Day (February 17), and the Friday after Thanksgiving (November 28) (this practice is common on a lot of the heavier NJT bus lines operating between North Jersey and the Port Authority Bus Terminal in Manhattan; this is the first time that I know of that NJT has done this for a South Jersey line).
- ROUTE 403 service to Winslow Plaza has been eliminated.
- On ROUTE 406, the 5:10pm express to Medford Lakes has been eliminated and replaced with a 5:10pm (formerly 5:12pm) to Virtua Hospital/Marlton.
- ROUTE 408 will begin service to the new Vineland Transportation Center next month.
- ROUTE 409 trips to Trenton will be re-routed in downtown Trenton to operate via Montgomery St instead of Stockton St between Front St and E State St.
- ROUTE 313 will now be rerouted through Glassboro to offer direct service to the Rowan University campus; service will begin operating to the new Vineland Transportation Center at 2 St and Landis Av, replacing the current Vineland Bus Terminal at 4 St and Landis Av starting next month.
- SOUTH JERSEY LOCALS
- ROUTE 459 will see minor time adjustments.
- ROUTE 463 will see adjusted departure times from Avandale Park and Ride to Woodbury.
- ROUTE 468 will see three new weekday trips which will now serve Downtown Quinton and the Maryville Clinic, via NJ 49, Sickler St, New St, and Cottage Av.
- ROUTE 459 will see minor time adjustments.
- JERSEY SHORE
- ROUTES 501, 504, and 508 will see minor time adjustments.
- ROUTE 502 will see a new 6:50am departure from Atlantic City to Atlantic/Cape Community College, a new 8:09am departure from Pleasantville to A/CCC, and added Sunday short turn trips from the Shore Mall in Egg Harbor Twp will depart at 3:30pm and 4:30pm; the 7:09am departure from Shore Mall will now originate at A/CCC at 6:32am.
- ROUTE 553 service to Upper Deerfield will be re-routed in Bridgeton to operate via NJ 49, Bank St, McCormick Pl, and NJ 77; the 12:20am from Bridgeton will be extended to Upper Deerfield and depart 7 minutes later.
- ROUTE 559 service to New Gretna has been temporarily discontinued due to a detour routing over the Bass River Bridge; buses will be detoured off of US 9 between Mathistown Rd and the Garden State Parkway intersection south of New Gretna; the 559 will resume it's routing over the Nacote Creek Bridge between Smithville and Port Republic, ending the detour via Moss Mill Rd.
- ROUTES 501, 504, and 508 will see minor time adjustments.
- MERCER COUNTY
- ROUTE 600 weekday service between 10:00am and 2:00pm will be reduced from every 30 minutes to every 75 minutes due to low ridership.
- ROUTE 601 service will be extended to the new Hamilton Marketplace complex; Saturday service is reduced from hourly to every 75 minutes; Sunday service is increased from every 2 hours to every 75 minutes.
- ROUTE 603 weekday service which terminated at Groveville will now be extended to serve the Hamilton Marketplace; all weekend service will also serve Hamilton Marketplace.
- ROUTE 606 service will be extended to serve the Hamilton Marketplace; a new holiday timetable will be implemented on this line.
- ROUTE 600 weekday service between 10:00am and 2:00pm will be reduced from every 30 minutes to every 75 minutes due to low ridership.
Thursday, January 02, 2003
Saturday, December 28, 2002
Monday, December 23, 2002
Friday, December 20, 2002
SEPTA blames fallen leaves for last month's abysmal on-time record. Environmentalists decry insensitive remarks; general manager appears on Discovery Channel to apologize.
For once SEPTA has it right as several rail lines were impacted because of slippery rail conditions (especially the R5 Paoli Thorndale line, where the #591 train was routinely 10-15 minutes late getting into Thorndale). Here's my problem: City Paper should know that "Fearless Leader" wouldn't be the one making the apology. That job would go to SEPTA's chief spokesman/apologist/liar Richard Maloney, as "Fearless Leader" does a better job ducking the media than Andy Reid. And we all know that "The Big Guy" ( (C) Bob Grotz of the Daily Times) has a far better track record coaching the Iggles than "Fearless Leader" has done at SEPTA.
Thursday, December 19, 2002
Tuesday, December 17, 2002
Monday, December 16, 2002
Sunday, December 15, 2002
Friday, December 13, 2002
Sunday, December 08, 2002
At the same time the subway-surface tunnel went out of service, an eastbound El train was taken out of service due to a door problem on car 1048. Siffuce to say that the next El train was very overcrowded.
Additionally, over the past 2-3 days, there have been numerous problems reported along Baltimore Av, with shuttle buses filling in for trolleys on the 34 off and on.
SEPTA wants to begin construction by 2003 and have the service running by 2007. The service would have stops in Phoenixville, Royersford, Pottstown, King of Prussia and other suburbs northwest of the city with major commuter traffic problems.
2007? What planet is SEPTA on if they think they can get this "Metrorail" mode built by 2007? Remember that neither Delaware County nor Bucks County has given a full committment to Schuylkill Valley, and there's a strong shot that Delaware County could derail this plan, unless they get something tangible in return (read: a full restoration of the R3 Elwyn line to Wawa and West Chester).
Saturday, December 07, 2002
The Inquirer article also notes that while Emperor Street's change of heart on Schuylkill Valley could increase the boondoggle's chances in Washington and Harrisburg, the wild cards in this matter are the continued luke warm reactions from Bucks County and Delaware County. Bucks County seems to have two advantages to turn the tide in favor of Schuylkill Valley: (1) SEPTA Board Chairman/Radio Impresarior/Turnpike Commissioner/Land Developer Extraordinaire and All-Around Arrogant Tyrant Pasquale T. Deon Sr. seems to be SEPTA's second biggest cheerleader for the MetroRail boondoggle (behind Fearless Leader, natch); (2) Gov. Really Lame Duck (Mark Schwieker) - a Lower Bucks native - is the new president of the Greater Philadelphia Chamber of Commerce, which is planning to merge with GPF, which is one of the biggest SVM boosters; and (3) Bucks County stands to see more boondoggle bucks if and when the Cross County MetroRail boondoggle ($1.2 billion and counting) is ever built.
Meanwhile, I wouldn't expect Delaware County to suddenly become enthusiastic over Schuylkill Valley anytime soon. Even though a P&W extension to King of Prussia would obstensively benefit Delaware County, the entire project would be built in Montgomery County. Plus, the extension of the R3 Elwyn line to Wawa (the now inactive station located on US 1 in Chester Heights) has seemingly been pushed to the back-burner, as has potential further restoration to West Chester. No offense to Delaware County's two board members - Tom Babcock and Tom Killion, both of whom seem to have the best interest of their consituencies - but where's Wally Nunn when you need him? I highly doubt MetroRail would even be on the radar screen for either Cross County or Schuylkill Valley if Nunn were still active within the SEPTA Board.
Long story short, at a time when property taxes are skyrocketing within Philadelphia, Emperor Street couldn't have picked a worse message to send to most city residents (save for those in the Manayunk area, where the SVM would operate) that the city is behind a $2 billion boondoggle that would mainly benefit Berks and Montgomery Counties (and have a token impact on Chester County).
Friday, December 06, 2002
- The R2 Warminster Line suffered delays due to downed wires near 9 St and Girard, right near the portal entering Market East Station. The incident occured at around 4:00pm. Service on the R7 Chestnut Hill East line was also affected by the downed wires
- Despite reports that buses were running about 15 to 20 minutes late, during the tail end of the AM peak, the 92/133 was running at least 30 to 40 minutes late
- The 101 Media trolley is still running buses as of 2:00pm Friday due to impassible conditions on State St in downtown Media
- A passenger suffered a head laceration after getting off an R3 train at Primos. The victim was transported to Delaware County Memorial Hospital in Drexel Hill, though neither his condition nor his name was released.
Still, SEPTA's decision to offer only generic transit updates instead of detailed detour information hasn't sat well with too many people.
Thursday, December 05, 2002
Wednesday, December 04, 2002
Monday, December 02, 2002
Sunday, December 01, 2002
As a result, SEPTA is running buses along the 10 route between Malvern Loop and 36-Lancaster with a diversion around the accident scene via 51 St, Merion Av, and 50 St. At least 4 buses from Callowhill were confirmed to be covering the shuttle - 3083, 3433, 5428, and 5431. Three LRVs are effectively cut off from Elmwood Depot until PECO Energy repairs the pole. 9069 (or whatever number it is) was seen laying over at 53 St between Lancaster and Lansdowne; 9029 (8053 block) was stuck at 51-Lancaster - directly behind the accident scene, and 9032 (8055 block) which was still at Malvern Loop. At last report, service was expected to be restored by mid-afternoon.
Subscribe to:
Posts (Atom)
